I’ll get some close up pictures tomorrow of the 4 places of where and how we are connecting it to the frame.
Had to do a little engineering to make sure we can remove it once it’s all built so we can remove it to getter powder coated and if someone wants to take it out later.
The tubing we’re using is 1.75 x .095 seamless.